Search
Close this search box.

Mixer truck maintenance

Because concrete will solidify into hard blocks in a short time and has a certain corrosive effect on steel and paint, washing the concrete adhering to the concrete tank and the inlet and outlet after each use of the concrete tank is a daily maintenance work that needs to be carefully carried out. These include:

a. Wash the feed port with water before mixing the plant’s home loading material each time, so that the feed port is kept wet during loading;

b. Fill the cleaning water tank with water while loading;

C. Wash the feed port after loading and clean the residual concrete near the feed port;

d. After the mixing truck manufacturer discharges to the site, wash the discharge tank, and then add 30-40L of cleaning water to the concrete storage tank; Keep the concrete tank turning slowly in the forward direction when the vehicle is returning;

e. Remember to drain the sewage in the concrete tank before loading the next time;

f. Clean the concrete storage tank and around the inlet and outlet every day after work, and ensure that there is no cement and concrete caking.

Share:

More Posts

Send Us A Message

Please enable JavaScript in your browser to complete this form.
Scroll to Top